A site visit was performed to evaluate the installation of a 2 customer-supplied Ecobee thermostats. The customer was not present at the time of the visit. An estimate for the installation was prepared and emailed to the customer. The proposed scope of work includes installing a transformer and a Fast-Stat system to provide proper power and functionality for the Ecobee thermostat. While on site, it was observed that the upstairs toilet appeared to be continuously running and refilling. This condition will be communicated to the customer. No work was performed during this visit.