7 Central Ave
West Lebanon, NH 03784
802-649-7317

Our Top Cities


Job Locations
for hartford, vt


Map of Hartford VT
Billy O.

Billy O.


Job Checkin

During this service visit, the existing Saniflo macerating toilet system was removed and replaced with a new Saniflo Saniplus unit. The shower drain was properly connected to the new pump, and the lavatory drain piping was modified to accommodate the updated pump dimensions. The discharge piping was also altered to match the new pump configuration, ensuring proper flow and compliance with manufacturer requirements. Due to the slightly larger footprint of the new toilet, a diamond tile bit was used to drill new anchor holes in the tile floor to properly secure the toilet flange bolts. The toilet was then set, aligned, and firmly secured to the floor. The connection between the toilet and the macerating pump was completed and sealed. Upon completion, all fixtures connected to the system—including the toilet, shower, and lavatory—were tested to verify proper drainage, pump activation, and overall operation. The system was confirmed to be functioning correctly with no leaks observed at ac

During this service visit, the existing Saniflo macerating toilet system was removed and replaced with a new Saniflo Saniplus unit. The shower drain was properly connected to the new pump, and the lavatory drain piping was modified to accommodate the updated pump dimensions. The discharge piping was also altered to match the new pump configuration, ensuring proper flow and compliance with manufacturer requirements.

Due to the slightly larger footprint of the new toilet, a diamond tile bit was used to drill new anchor holes in the tile floor to properly secure the toilet flange bolts. The toilet was then set, aligned, and firmly secured to the floor. The connection between the toilet and the macerating pump was completed and sealed. Upon completion, all fixtures connected to the system—including the toilet, shower, and lavatory—were tested to verify proper drainage, pump activation, and overall operation. The system was confirmed to be functioning correctly with no leaks observed at ac During this service visit, the existing Saniflo macerating toilet system was removed and replaced with a new Saniflo Saniplus unit. The shower drain was properly connected to the new pump, and the lavatory drain piping was modified to accommodate the updated pump dimensions. The discharge piping was also altered to match the new pump configuration, ensuring proper flow and compliance with manufacturer requirements.

Due to the slightly larger footprint of the new toilet, a diamond tile bit was used to drill new anchor holes in the tile floor to properly secure the toilet flange bolts. The toilet was then set, aligned, and firmly secured to the floor. The connection between the toilet and the macerating pump was completed and sealed. Upon completion, all fixtures connected to the system—including the toilet, shower, and lavatory—were tested to verify proper drainage, pump activation, and overall operation. The system was confirmed to be functioning correctly with no leaks observed at ac