For this job, we removed the existing lavatory faucet in the first-floor bathroom and installed a new, properly fitted replacement faucet. The new faucet was securely mounted and connected to the existing water supply lines, ensuring proper alignment and leak-free operation. All connections were thoroughly inspected, and the faucet was tested to confirm correct functionality, proper water flow, and accurate temperature control. All work was completed to current plumbing standards, and the work area was cleaned upon completion.