Installed a new customer-supplied Delta tub/ shower cartridge in the 2nd-floor hall bath. Installed new water shut-off valves for the hot and cold sides of the gray box for washing machine hook-ups. Everything is tested, cleaned up, and working as it should. I did set the temperature of the mixing valve for the cartridge I installed higher than the factory setting with the consent of the customer.