CAME OUT FOR A SERVICE CALL. INSTALLED 5TON HP/AH W/T-STAT AND SLAB. SYSTEM WAS INSTALLED PROPERLY AND WORK AREA WAS CLEAN WHEN JOB WAS COMPLETED. CHECK CONDENSER COILS, AND COMPRESSOR DELAY SAFETY CONTROLS. CHECK THERMOSTAT, AIRFLOW, AIR FILTER, ENEGERY CONSUMPTION, DRAINAGE, AND ALL ELECTRICAL CONNECTIONS. EVERYTHING IS RUNNING GREAT.