9/12/25 Upon arrival, to the home, I met the cleaning lady who was present at the home. She knew of my arrival, when I got there she was in the middle of using water. She asked for a few minutes before I cut the water off. Moreover, after a few minutes, I cut the meter off and began by doing the main valve outside. Furthermore, After I had the main valve connected, I went inside and began making the necessary adjustments to get ready for inspection. I realized I didn’t have a concrete bit, which I needed to secure water lines to concrete. I went to nearby supply and picked one up. Hence, I then went to turn the water back on to the home and no leaks were detected anywhere. Master Bathroom is ready for inspection. I did speak with Matt at Entrusted and they will be scheduling the inspection for Monday. 09/11/25 Upon arrival met with Matt with entrusted and spoke about what’s going on and got on the same page. Then met with Jackie to go over the shower diverter and valve locations.