4/17/25 Everything is connected, in place with straps but the two hose bib lines outside. Will need to come back to strap and foam exterior hole. Water is on to the entire home, all fixtures are working, no leaks detected. 4/16/25 All drops but water heater and two hose bibs are all tied into main line in the attic and strapped. Access holes in drywall are all cut but three holes. Laundry and guest bathroom horizontal lines to feed fixtures are all connected and strapped, just waiting to cut water off to stub out officially. Will need to do master bathroom, and kitchen tomorrow with the main line. 4/15/25 Ran both hot and cold lines in attic, they’re strapped and tees to branch off are all connected. Drywall paths are cut to make our connections on the ground level. Drops all have lines stubbed up for final connections in the attic. Main line is dropped on exterior of home In place, ready to be tied in, once we cut the water off. 04/14/25 Upon arrival to the location, we