Upon arrival to the location, I called Rob the engineer to meet me at the front desk. Shortly after, Rob took me upstairs to the unit and showed me the bathroom where Shelly wanted the tub. There’s currently no tub there but Rob believes that at some point there was and the owners got it removed. He showed me a few units below and above with the same layout and they all had tubs in the exact location. He also showed me the building plans where they also have a tub in that location. Shelly also wanted some adjustments done to her shower stall, she wanted to add another shower spout and move the handheld wand to another location. After checking the unit, I got on the phone with Shelly and explained that we will have to cut into the tiles first to expose the drain and water lines to assure we can tie in from above. She understood and gave me the green light, she did mention she had meetings throughout the afternoon but she okayed the demo portion. When I got back to the building, I got wi