Remove toilet in master bathroom and opened up wall and replaced cracked cast iron stack with schedule 40 pvc . Made connection to existing cast iron at the base of stack removing all cracked cast iron. Reset toil with pvc to cast iron repair flange. Checked all work for leaks and function Customer is responsible for all drywall repairs.