Upon arrival to the location, Christine advise us that we were good to begin while she made her way over to the house. We shut the water down at the meter and made our cut into the main valve to make repairs. After getting main valve on and hooked up, we turned the meter back on and held the main valve off. Furthermore, I cut into the drywall and tied into the hot side to run it outside. We then ran the new hot line outside next to the cold side and got our two new valves in place. We strapped everything down and tested for leaks after all the connections were made. We covered both the holes we made for the hot line and the other hose bib with cement. Hence, christine was on a zoom call, but I briefly went in to advise her we were done, and showed her the work. In conclusion, everything is good at the moment. Tech will cut drywall to access the shower valve from behind to tap into the hot line to bring line out to exterior to feed outdoor shower. Will run line in copper on exterior