Upon arrival, customer had an annual membership visit. Upon inspection we did notice a few things that needed to be updated/ corrected. In the bathroom the emergency stop to toilet as well as supply line will need to be updated. The supply line had a plastic connection and we suggested to change to a stainless steel connection with new supply valve. Underneath lavatory sink both emergency stops were old style multi turn valves that will need to be updated to a 1/4 turn shut off. The drain was an accordion drain at an incorrect application. We suggested to update and correct offset. In the kitchen there are 4 emergency shut offs with a tap valve on the cold side. We recommend to remove tap valve due to gasket failing in the near future, and to replace 4 emergency stops with two dual emergency shut offs with a 1/4 turn shut off. Estimates provided for repairs Thank you for using JohnThe Plumber -Shane