Upon arrival the homeowner had multiple items that she wanted addressed. They were connecting the ice maker line to the new refrigerator, installing a customer supplied garbage disposal, a new customer supplied pop-up in the hallway bathroom lavatory sink, and installing a new customer supplied pop-tub drain in the master bathroom. I also tightened the handle in the shower in the hallway bathroom. After installation of everything we ran the water to make sure that everything was working properly. Everything is working properly with no leaks.