Upon arrival customer informed me that he bought a smart toilet with neo lock flange that needs to be installed. I advised customer I would need to also charge for the bracketing. I removed old toilet and cleaned flange. Flange was in great shape. I secured the neo lock boot to the tile and then assembled the locking bolts to secure toilet. Once I seated the toilet into the gasket I locked the toilet down. Customer water supply is Uponor and had an isolated angle stop. The toilet supply was built into the stop so I advised customer I needed to change it to a 1/2 x 3/8. Once connected to supply, I tested toilet to make sure it flushed flawlessly. No drainage issues. Also tested water supply and no leaks. Customer tested toilet himself. Customer satisfied.