Replaced galvanized water service which had failed. We removed any necessary pavers and rocks along the walkway in order to route the new 1.25;PVC water service. The new line was be ran at a depth of 12''-14'' from the meter and connected to the house where we installed a new manual main valve, moen flo valve, and sprinkler water supply pvc valve. We used Oatey PVC glue and work was done to code. Includes: Permit fees Pulling up pavers Water service from city meter to house new valve at house and irrigation System 2 year warranty on labor 5 year warranty on PVC material Does not Include: Concrete cutting Replacing pavers Damage to landscaping Waiting on inspection to complete backfill.