Replacement of shower pan includes pre-pitching the floor. Shower demolition and shower curb must be done by others. John the plumber is not responsible for damaged tiles or surrounding work area or any tile installation. If cast iron pipes are present recommend replacing P-trap under the floor which is an additional charge. Includes permit, drain replacement, patching of concrete in drain area, and shower valve.