TEXT WHEN YOU GET THERE AND HE WILL GIVE YOU THE CODE TO GET IN Scheduled with Jerry 703-593-4039 The following discrepancies were found during your Semi Annual Fire Inspection that needs to be corrected for Compliance: Pre UL system. Range Guard 1.25 due for hydro in 2026. THE ABOVE ISSUES WILL REQUIRE THIS SYSTEM TO HAVE A FULL UPGRADE TO A UL300 COMPLIANT SYSTEM. SCOPE OF WORK: Furnish necessary parts and labor to remove existing system and install a New UL300 260 Gallon Range Guard system. NOT INCLUDED IN THE PRICING OF THIS QUOTE: • Permit & Final Inspection Fees (If applicable. Pricing TBD by township upon issuance of permit) • NJ Sales Tax • Engineered Drawings (If applicable) ***NOTE*** FINAL INSPECTION WITH TOWNSHIP IS INCLUDED IN THE PRICING BUT WILL BE BILLED SEPARATLEY ***NOTE*** CUSTOMER WILL NEED TO HIRE AN ELECTRICIAN TO ADDRESS ANY ELECTRICAL WORK.