We found that the sequencer starting the heating strips sequence was shorted causing voltage drops through-out the system. We went to shearer and got a 3 stack sequencer and tested the unit. The system is only a 10kw heat kit and it’s too cold for the heat pump to run. The system is now heating in emergency heat at its full capacity.