Installed Tempstar F96VTN 96% AFUE two-stage furnace in Fultondale, AL. Removed old unit, upgraded flue to PVC. Installed new return drop and supply plenum. Connected to existing ductwork. Wired to Ion™ System Control. Performed combustion analysis and adjusted gas pressure. System now operating at peak efficiency.