Gas heating preventative maintenance performed 1st floor Check filter - 20x25x4 due soon Inspect burners - no major concerns Clean flame sensor Ohm test igniter: 56.6 Inspect wiring for loose connections and/or hot spots - none found Check humidifier pad: new today Inspect exhaust flu - 3” pvc Set thermostat for heat Check amp draw on blower motor: 3.10 Check amp draw on inducer motor:0.70 Check delta T - 45° Furnace is in optimal running conditions Gas heating preventative maintenance performed Check filter - 20x25x4 due soon Clean flame sensor Inspect burners - no major concerns Ohm test igniter: 58.7 Inspect wiring for loose connections and/or hot spots - none found Check humidifier pad: Inspect exhaust flu - 3” pvc Set thermostat for heat Check amp draw on blower motor: Check amp draw on inducer motor:0.72 Check delta T - 50° Furnace is in optimal running conditions