* Perform blower door test and measure results. Calculate the Building Airflow Standard for the home and compare with the target. Complete an additional test out with the blower door after the work is performed. * Remove the flooring in the attic area and relocate most of the plywood to the garage area ceiling so storage can be relocated to above garage, * Block off area around angled ceiling in the front of the home from the attic space to ensure no blown in insulation gets back into the cavity. * Build a dam around the pull down stairs and around the drop to the garage ceiling to hold back the insulation to the spaces we are adding insulation in the attic. * Move the existing insulation in the main attic space and air seal all top plates and any penetrations from the attic space to the second floor with single part spray foam. * Install new baffles onto existing roof line to ensure attic is properly ventilated and there is no blockage of the soffit areas. This will also e