Performed 2 full system QAs Attic Gas pressure check Combustion analysis Temp rise ISD to 000 for 2 stage Constant fan to tap 5 Removed ins and heat tape per request Supplied new 3/4 split shell ins for after piping is cleaned H/o will install it Installed hi volt cover plate Insulated trap Fixed slight kink in drain tubing by re piping Basement Customer found a scratch on liquid line and will monitor it for any issues Calibrated both rectorseal disconnects to spec Re wired outdoor hi volt to proper grounding Customer is monitoring noisy fan motor due to finding loose mounting bolt Ran both acs for test out too cold to check charge properly