Arrived to find system set at 78 and satisfied at 78 Determined clogged drain line and water in secondary pan triggering float switch. Sucked drain line and cleaned with chemicals. All is working as designed now I did while on site Dress system up from mastic all in air handler door and drain line not insulated and secondary pan not sealed off or capped