Perform heating maintenance on 3 geothermal systems. Force each unit into stage 12 high heat and verify proper operation parameters. Humidifier water panels not due yet left 5 behind for whole house 2 for mother suite and 3 main house. Humidifiers don’t get much use because of geothermal heat not being super dry to begin with. All three geothermal units operating within manufacture parameters. Aid tool breakdown submitted to file