Arrived onsite and was shown the chandelier the customer wanted hung, and the situation with the ceiling that needed to be worked out in order to get it hung. I worked up a solution, and then assembled the light. In terms of height, it already hung pretty low so we decided on 5 links and that’s what I went with. I drilled out the center of the box for the allthread, connected it up with 3” heavy duty thread screws and then finished unwrapping the chandelier, installed the bulbs, tested and verified it working.