Arrived onsite today and the resident let me know she wants to upgrade her panel which led me down to the basement. She showed me the panel, and i also talked to her about everything that would be involved from grounding, how we would run the cold water ground, what the new panel would look like and include, as well as all the other details in our job. It will be done with a pg county permit and we will replace the service cable as well because it is in bad shape. The other thing is the single smoke detector on the first level that is hardwired and original to the house. After discussing the process i presented options and we moved forward on the job. I let her know the tree that is in front of the meter area would have to be removed or cut down for our job and for bge to be willing to do the tie in as well. We schedules the job for next week for July 16th and 17th. Arrived onsite 07/16/2025 and began by covering the basement in plastic and i started working on removing boards and