Pride Plumbing came out and performed the following work: 1) cut into and removed a small section of concrete flooring; 2) dug down to the base of the floor drain's P-trap and drain line; 3) removed the old floor drain and P-trap; 4) rebuilt the floor drain and its P-trap with new PVC piping and fittings up to the floor height (connecting onto the existing drain line using a new Fernco coupling); and 5) replaced the dirt and concrete we took out.