203 North Main Street
Mount Gilead, NC 27306
910-439-9598

Job Locations
for pinehurst, nc


Map of Pinehurst NC
Becky L.

Becky L.


Job Checkin

Pride Plumbing came out and performed the following work: 1) drilled down through the floor and into the crawlspace and installed new PEX water and PVC drain lines for a sink; 2) ran a new PEX water line from the new sink area over to an existing water line underneath the building and installed a new water supply stop on the water line; 3) connected the new PEX water line to the sink's faucet; 4) installed a new PVC P-trap and drain assembly underneath the sink and down through the floor and made the appropriate drain connections to the sink and underneath the building; 5) tested for leaks on the new water and drain lines; and 6) performed a leak search in the ceiling where a water stain had recently presented itself (we found that someone had spilled water on the floor in an upstairs bathroom and it had leaked downstairs).

Pride Plumbing came out and performed the following work: 1) drilled down through the floor and into the crawlspace and installed new PEX water and PVC drain lines for a sink; 2) ran a new PEX water line from the new sink area over to an existing water line underneath the building and installed a new water supply stop on the water line; 3) connected the new PEX water line to the sink's faucet; 4) installed a new PVC P-trap and drain assembly underneath the sink and down through the floor and made the appropriate drain connections to the sink and underneath the building; 5) tested for leaks on the new water and drain lines; and 6) performed a leak search in the ceiling where a water stain had recently presented itself (we found that someone had spilled water on the floor in an upstairs bathroom and it had leaked downstairs). Pride Plumbing came out and performed the following work: 1) drilled down through the floor and into the crawlspace and installed new PEX water and PVC drain lines for a sink; 2) ran a new PEX water line from the new sink area over to an existing water line underneath the building and installed a new water supply stop on the water line; 3) connected the new PEX water line to the sink's faucet; 4) installed a new PVC P-trap and drain assembly underneath the sink and down through the floor and made the appropriate drain connections to the sink and underneath the building; 5) tested for leaks on the new water and drain lines; and 6) performed a leak search in the ceiling where a water stain had recently presented itself (we found that someone had spilled water on the floor in an upstairs bathroom and it had leaked downstairs).