Pride Plumbing came out and performed the following work: 1) cut into and removed a small section of concrete flooring; 2) dug down to the base of a drain line; 3) cut out and removed a defective section of the drain line; 4) rebuilt the drain line with new PVC piping and fittings up to the floor height (adding a cleanout and connecting onto the existing drain line using new Fernco couplings); and 5) replaced the dirt and concrete we took out.