Pride Plumbing came out and performed the following work: 1) cut and jackhammered 20-feet of concrete; 2) dug down and exposed the lowest point of entry at the home's foundation for the outside main sewer septic drain line; 3) cut the line where it enters the home's foundation and installed a new sewer line connection for a new bathroom; 4) ran new PVC piping back to the new bathroom's location; and 5) roughed-in the new PVC pipe for a toilet, bathtub/shower, and bathroom sink vanity.