Have any feedback for us? We'd love to hear it! Call us at (610) 595-9072 and let us know how we are doing.
Sight glass had approx 4†of water. Made call for heat from 3 thermostats. Monitored pressure and water levels and operation of condensate pump. Performed combustion and draft test. Draft -.016†WC CO levels greatly improved and within permissible level. Steam pressure 2.25# at the highest. Steam boiler is operating well at the time of this inspection.