Installed new American standard furnace and coil. Installed new heat pump on new leveled pad. Ran new 7/8 lineset. Installed new supply plenum and return drop. Installed new condensate pump and vinyl tubing. Ran new 8 wire to thermostat. Adapted to existing flue and intake. Adapted to existing gas line. Installed new Lp kit. Installed new switch an outlet. Tested system in heating and aux heat. Tested condensate system. System running properly. Payment collected.