Coil replacement completed Took out old coil Built new one with new txv valve Slid new coil in place and tie in copper and drain Flush drain line out Installed new filter drier Pressure tested and vacuumed copper lines Recharged unit and let ran for 20 minutes Adjusted charge Temperature difference was at 19-21 and home was cooling Unit was draining