Walked job with AJ gave a quote on multiple systems went up into the attic. James was with us at the time got a rough idea. Decided that we’re probably gonna relocate the system to the attic redo all the ductwork air brace new copper line set new drain line high-voltage up in the attic would need to be ran for electrical disconnect new boots grills collar client has to wait for General contractor to go over the scope of the job before he can make any decisions. This job won’t start for about six weeks out, but he’s also getting other estimates.