Installing a 4 ton Goodman, heat pump system. Connecting to existing ductwork, drain line, refrigerant piping, high voltage electrical, and low-voltage electrical. Replacing thermostat. Client is receiving an extra one year of free labor warranty with purchase of system. Altogether she will be getting a 10 year parts warranty, 10 year compressor warranty, and two year labor warranty. As well as one year free prime membership. Scheduled for install on Friday, November 7. Client paid 50% deposit of $5600. The remaining balance is due upon completion of $5600.