CAME OUT FOR AN ESTIMATE ON EQUIPMENT. INSTALLED 3 TON CONV HP AH 10YR PL. MADE SURE EQUIPMENT WAS INSTALL CORRECTLY AND WORK AREA WAS CLEAN WHEN FINISH. CHECK THERMOSTAT, AIRFLOW, AIR FILTER, DRAINAGE, ENERGY CONSUMPTION, AND ALL ELECTRICAL CONNECTIONS. EVERYTHING WAS WORKING FINE.