Performed heating maintenance on first floor furnace Pulled burgers, they're in good shape Pulled condensate trap and flushed with hot water Pulled flame sensor and cleaned Filter OK Replaced humidifier pad Run tested furnace and performed combustion analysis Combustion numbers are very healthy Low fire 2.2" 38⁰ temp rise Med fire 5.8" 42⁰ temp rise High fire 11" 39⁰ temp rise Furnace is operating within factory specs at this time Heat pump operation is also perfectly within healthy operating numbers at this time: 31,000btu output 150⁰ Vapor line tempature 30⁰ temperature rise 46⁰ outdoor temperature Invoice payable online Also sent maintenance plan as a separate email