Installation of new recessed light located in the shower on the second floor. We will remove the current switch set up and replace with a new 2-gang screw on box with new switches for the current set up. We will also replace the current damaged outlet located below the 2-gang switch bank. We will run a new wire from the switch bank by way of drilling down the header and landing in the two gang area to be installed in new box. Installation of new two pole breakers to eliminate multi-shared neutral circuits. Multi-shared neutrals cause overheating and create energized circuits even while the circuit is off. Installation of new smoke detectors throughout the bedrooms located on the second floor. Detectors are currently deep yellow/brown and are blinking red showing end of cycle. We were called out today to look at the installation of a recess light in the upstairs hallway bathroom shower. While assessing the circuit to the bathroom, we discovered all the devices were “back-stabbed,” wit