Pride Plumbing came out and dug down underneath a short section of asphalt pavement, uncovered and cut into the outside main sewer septic drain line, installed two new one-way PVC cleanouts with brass caps (connecting them to the existing outside main sewer septic drain line going to the town sewer tap, and the septic line going underneath the building's foundation, with new PVC fittings and no-hub couplings, tested the new piping for leaks and working order, backfilled the area we dug out, and installed gravel over the area.