Location: Side of Building – Wedding Venue 1. Equipment Installation • Supply and install a Trane 5-Ton Conventional Split System, mounted on a new concrete pad on the side of the building. • The system will be heat pump only—no electric heat strips will be installed, as the building’s electrical capacity does not allow for auxiliary electric heat. • Install a -rated disconnect for safe servicing and compliance with electrical codes. 2. Exterior Ductwork • Install custom sheet metal supply ductwork from the indoor equipment, mounted to the exterior wall, at an elevation of approximately 10–12 feet before entering the building. 3. Interior Spiral Ductwork • Supply duct will transition inside to exposed spiral ductwork, mounted high and close to the wall/corner to maintain open floor space and an aesthetic look for the venue. • Spiral duct will be sized appropriately for airflow requirements and will include six (6) supply registers position