824 S Central Expressway, Suite 100
Anna, TX 75409
903-482-4900

Job Locations
for frisco, tx


Map of Frisco TX
Jacob P.

Jacob P.


Job Checkin

Installation Includes: 1. Wall Mount Installation: • Secure mounting and installation of three wall-mounted indoor units in specified rooms. 2. Handheld Remote Controllers: • One handheld temperature control unit provided per zone (total of 3). 3. Refrigerant Line Sets: • Installation of copper refrigerant lines connecting each indoor unit to the outdoor condenser. 4. Control Wiring: • Installation of control wires between the outdoor unit and each indoor unit for system communication and function. 5. Condensate Drain Lines: • Each indoor unit will have a dedicated PVC condensate drain line routed to an appropriate drainage location. 6. System Start-Up and Commissioning: • Full system start-up, pressure testing, and refrigerant charging (if required) to manufacturer specifications. • System performance will be verified, and final refrigerant levels will be confirmed. Any necessary adjustments or refrigerant top-off will be included per Mitsubishi guidelines. ⸻ Additional