Performed peco inspection, checked media air filter ok. Blew out condensate trap and drain. Tested electric back up heaters. Checked voltage, amperage and electrical connections, measured capacitor values. Started heat pump, calculated btu output. Tested defrost cycle. Checked operation and temperature rise across coil.