Two system rooftop package equipment. Filter inspection, cooling inspection, blower inspection, thermostat inspecti, above ceiling duct inspection, above celing air balance, All equipment is running as expected on the roof. Air filters were replaced in February and are still in very good condition. Confirmed multi-stage cooling on the front system and single stage cooling on the rear system. All blower speeds are set to the factory settings that do have room for adjustments but will require pre-authorization and roof access. The rooms in question for "Tara" are all associated with the thermostat in the front office reception area The back hall thermostat that controls the back of the building system only supplies to the rooms on the east wall. The entire center Island, West wall, and North and South rooms are all on the two-stage large system controlled by the thermostat in the front reception office Air balance to close one of two supply registers in the front reception area and