Bryant Georhermal unit is operating properly. 30x36x2 air filter is new today. Humidifier pad in good condition. Tested humidifier operation. Humidifier is operating properly, test ran geothermal unit in electric backup heat to test hear strips. All heat stips are properly running at ~20A. Electric heat temp rise of 29F. Electric heat is operating properly. Blower motor is operating properly within specs. Also tested geothermal operation to verify proper operation. No issues found during today's visit.