This estimate includes the installation of a new 150A, 30 space panel and updates to the grounding and bonding system. Original call was to inspect panel, possible phase loss. Once on site we discovered the top 2 pole breakers were found with damage along where connections were made to buss bar on A-phase. We recommend that the challenger panel be replaced with a new 150A panel. We shall return Monday morning to replace the panel and update the grounding. Permit shall be pulled for return visit. We have updated the homes grounding and bonding system and have replaced the the existing damaged panel with a new 150 panel. Inspection shall be scheduled for the 25th of July