Reason for today’s visit with the customer was to quote installation of 7 Recess lights and two pendant lights in the kitchen. Our plan of action would be to take power from the current switch bank that goes to a single tube light and convert it into a four gang switch bank. We would then convert the tube light into two pendants. We would run new switch legs to all three new recess locations and put them on their own respective switches. At the panel we will install an ARC-Fault breaker to meet proper safety standards. Inside the panel we noticed lack of surge protection, two multi-fed circuits on separate breakers, and neutrals and grounds sharing the same lugs. We recommended correction as soon as possible for these safety hazards. The customer stated he would reach back out if he was ready to move forward with the work when it begins over the next couple of months.