Pride Plumbing came out and provided a cost estimate to perform the following work: 1) dig a 9'x9' hole in the yard, install a new E/One sewage pump system along with gravel as a base layer; 2) install 1-yard of concrete around the pump's basin after its tank has been inspected and approved; 3) leave the hole open for an electrical contractor to install the wiring for the new pump; 4) dig another ditch from the new E/One pump system to the town's sewer tap and hook up to the town sewer tap using pressure pipe and fittings; 5) connect the pump to the home's existing main outside drain line; 6) test the new pump and drain lines for working order; 7) backfill the ditches after the work has been inspected and approved; and 8) spread grass seed and straw after the work is completed.