Pride Plumbing came out and performed the following work: 1) turned the water off to the building; 2) removed two urinals and their flush valves; 3) cut access holes in the wall where the drain pipes came through; 4) removed all PVC and cast iron piping that was going directly to the urinals, replaced it with new PVC piping and fittings, and a new drain system for each urinal; 5) hung and installed two new urinals and installed their flush valves; 6) tested the urinals for leaks and proper operation; and 7) installed plastic plumbing panels to cover the holes we cut in the wall.