Customer called to install a chandelier I installed a customer supplied chandelier on a 18 foot ceiling in the main foyer The box in the ceiling was recessed to far in the drywall so installed a spacer box so the bracket for the chandelier would be tight to the ceiling giving it the best support I also removed and replaced 4 three way switches (existing switches are original to the home) Inside the electrical panel I noticed many multi feed wires on single pole breakers So I removed them and installed two pole breakers for these circuits I also installed a whole home surge protector Customer has a 18 month warranty on work preformed