Pride Plumbing came out and performed the following work: 1) pumped down a sewage lift station tank; 2) stopped incoming sewage from other lift stations; 3) set an extension ladder in place down inside the lift station tank; 4) gained entry to the bottom of the tank and removed the bolts from a flange; 5) used a saber saw to cut four feet off the Schedule 80 piping for the inlet pipe; 6) removed the cut section from the lift station and installed a new four foot section of Schedule 80 piping; 7) used a new four-inch Hymax coupling to connect the two pieces of pipe together; 8) bolted the new section of pipe in place and installed a new flange; and 9) tested for leaks and proper operation of the repair.