Pride Plumbing came out and installed customer supplied faucets in two bathrooms, installed a new Delta toilet in a guest bathroom, finished the drain-waste-vent (sanitary) system, installed PVC pipe strapping every 4-feet underneath the house in the crawlspace, and tied the new outside main sewer septic drain line into the septic tank and sealed around the pipe and septic tank inlet with hydraulic cement.